Posts

Showing posts from March, 2018

MANUFACTURE OF DECORATIVE COLUMN BASE FROM PREDISSED MODEL

Image
From a details of measurements facilitated by the client and following his specifications, we proceeded to the manufacture of half column of natural stone , pedestal type that was going to be placed in a decorative way in an establishment. The material chosen by the client was travertine gold and the final finish that he decided was polished to highlight even more the intense travertine gold color. Here are some photos of the manufacturing process:

CLEANING AND TREATMENT OF TERRACOTTA FLOOR IN MADRID

Image
On this occasion we find a house in Madrid of about 100 m2 of terracotta floors distributed in several rooms. The floor was not new, so we had to proceed in the first place to a pickling process, to eliminate any remaining old treatment and also be able to descale the deeper and adhered stains. Once we had the entire surface cleaned, we had to wait 2 weeks until the soil completely dried up, as we got rainy days and the soil evaporated all the moisture and dried completely. Once verified that the floor had dried, we proceeded to the application of interior treatment with gloss finish finishing following the specifications of the client. Here we show you photos of the work done: